|
Multiplus 2 GX Problems after Firmware Update 3.75
|
|
7
|
121
|
2 July 2026
|
|
Float charging?
|
|
5
|
81
|
1 July 2026
|
|
MultiPlus-II GX 3000 consuming less power in idle
|
|
2
|
43
|
27 June 2026
|
|
Probleme configuration multiplus 2
|
|
8
|
96
|
25 June 2026
|
|
Débutant, Validation partie terre pour système modulaire (Multiplus II GX 48 3000 + 2*US5000)
|
|
2
|
34
|
23 June 2026
|
|
Kleine PV-Anlage um AC-Speicher mit MP2 erweitern?
|
|
28
|
365
|
22 June 2026
|
|
Multiplus 2 System als 400V Netz
|
|
10
|
107
|
20 June 2026
|
|
MultiPlus-II 48/3000 ESS grid-parallel: discharges 30s, relay clicks
|
|
0
|
24
|
19 June 2026
|
|
Wrong measurements
|
|
18
|
359
|
11 June 2026
|
|
Weather prediction in Node Red
|
|
85
|
2165
|
9 June 2026
|
|
Mit einem MP II-GX 3000 u. 5 MP II, ein 3Phasen system mit je 2 MP II pro Phase aufbauen
|
|
3
|
91
|
4 June 2026
|
|
Multiplus ll GX - VRM not showing battery %
|
|
5
|
64
|
3 June 2026
|
|
V 3.73 and nodered
|
|
3
|
117
|
2 June 2026
|
|
MultiPlus-II 3kW for 'UPS' pump power backup, review schematic please?
|
|
8
|
129
|
2 June 2026
|
|
Multiplus 2 gx fan turns on at high grid measured injected power (but no MPII activity)
|
|
14
|
210
|
21 May 2026
|
|
Erdung eines Insel-Solarsystems
|
|
25
|
319
|
31 May 2026
|
|
Accommodating EV charging within ESS
|
|
7
|
113
|
28 May 2026
|
|
Strange increase and in frequency hum on Multiplus 2
|
|
3
|
64
|
26 May 2026
|
|
Feature Request: Reset days until balancing after 100% charge reached for configurable time
|
|
1
|
66
|
26 May 2026
|
|
MultiPlus II - WiFi issue
|
|
3
|
98
|
23 May 2026
|
|
Multiplus-II in parallel not exporting to grid
|
|
4
|
73
|
22 May 2026
|
|
MultiPlus-II Warnung Temperatur hoch und Warnung Überlastung Wechselrichter
|
|
6
|
149
|
19 May 2026
|
|
Current Sensor Cable Length
|
|
3
|
171
|
18 May 2026
|
|
Remote control over a Multiplus II 10 kW inverter
|
|
10
|
126
|
17 May 2026
|
|
Significat behavior change with multiplus-ll-firmware-v556 > 558
|
|
12
|
1140
|
14 May 2026
|
|
ESS assistant deleted when downloading 3 phase config
|
|
1
|
36
|
14 May 2026
|
|
Battery consumption peaks of 50 kW
|
|
2
|
75
|
14 May 2026
|
|
Absicherung AC IN bei 3 Phasenbetrieb von Multi Plus 2 48/3000
|
|
14
|
140
|
12 May 2026
|
|
Dashboard has no graph for "grid"
|
|
2
|
63
|
12 May 2026
|
|
Two MP in one site, one inverter only, second charger only
|
|
4
|
82
|
11 May 2026
|