Hi,
Could the status of the relays, Quatro, be made visual on the VRM portal, especcially de AC2OUT relay will be very usefull.
And may be additional, add a possibility to switch the AC2OUT relay manually on the CCGX
Harold
Hi,
Could the status of the relays, Quatro, be made visual on the VRM portal, especcially de AC2OUT relay will be very usefull.
And may be additional, add a possibility to switch the AC2OUT relay manually on the CCGX
Harold
In a similar way to do with AC2 it would be wonderful to reduce the time from generator start to AC2 available to less than two minutes. This sounds trivial but the implications are large. More than one prestige yacht manufacturer bypasses the Quattro because the delay is too long. The client thinks a fault is in the system. Start generator and two minutes still no power? It would be good to reduce this if the installer wishes. In some cases the delay is far too long. It is a real shame because it ruins a really good system for no apparent reason.
Nice idea. Could be done pretty compactly.
We have achieved this functionality using a combination of one of the built in relays on the cerbo and an assistant. We also control this via node-red.
Share your great idea, or help out by voting for other people's ideas.
Quattro AC out 2 fixed delay in some cases is too long - Better to be user selectable.
Make a Quattro compatible to Multiplus same system 12/3000 or so
1 wire Remote control of multiplus inverter using BMV relay output but no additional relay.
Charge Current Limiter including Alternator
Generator Cool Down incorporated in Auto Gen Start software
Transfer Switch Mode for Quattros to solve overloading issues during transfers