Hi folks, in the manual of the VM-3P75CT, for the grid measurement of a 3-phase installation there are also all three of the phases marked as directly connected to the meter, but the heavily recommended circuit breaker is only L1 and N (which makes sense, regarding the voltage supply for the meter only needed at L1 as also stated in the manual). In conclusion, if the phases L2 and L3 are also directly connected, there would be no disconnect for maintenance possible???
Are these direct connections to L2 and L3 really necessary or is that a misstep in the drawing?
Best regards
Olli