I am doing a major upgrade to my system and would like comments and suggestions on my plan for monitoring the system through my existing Color Control GX.
System Components (all updated to latest firmware) -
1 x Color Control GX (CCGX)
1 x MPPT 150/70 – TR (CC#1)
1 x MPPT 150/70 – Tr VE.Can (CC#2)
2 x Quattro 48/5000/70 120V (Inverter#1, Inverter#2...Split Phase)
1 x Lynx Shunt
My MPPTs cannot be synchronized (daisy chained) because only one has the VE.Can connection port. But, both can be set-up in parallel (via PowerIn) with the same charge parameters to provide power to the system.
Both of my MPPTs will be connected separately to my CCGX via VE.Direct cables. CC#1 → CCGX VE.Direct#1, CC#2 → CCGX VE.Direct#2.
The two Quattros can be “daisy chained” via a RJ45 UTP cable and a terminator will occupy the open port on Inverter#2.
Inverter#1 will be connected to the CCGX via a RJ45 UTP cable to a CCGX VE.Bus port.
Lynx Shunt VE.Can port will be connected to the CCGX via a RJ45 UTP cable to a CCGX VE.Can port and a terminator will occupy the open port on the Lynx Shunt and the open port on the CCGX .
CCGX also connected to home Wifi.
Any feedback would be appreciated!