question

januss avatar image
januss asked

Mppt priority over IP22 charger VE network

system 24 volt. One battery bank 200AH. Two chargers in network. Ip22 16 amp and mppt 100-20. When I put this in synchronise charge the mppt stops charging and ip22 takes the lead. I have managed to work them together by removing the network and adjust charge voltage on the IP22. So the ip22 charger only kicks in at a lower voltage. Maybe this issue will be sorted in a new update so that when solar power is available the main charger will not kick in if it is not necessary.

MPPT Controllers
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

0 Answers