question

mufassa avatar image
mufassa asked

Assistant to change invertor state

Is one of the assistants able to change the inverter state (3-phase Quattros) from 'On' to 'Inverter Only' and back again based on charge level?

Looking at trying to create a safety mechanism based on some scripts I have created to charge based on Octopus Agile spot prices, but a safety mechanism to say re-connect grid if battery SOC reaches >10% would be reassuring...

MultiPlus Quattro Inverter Charger
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
Alexandra avatar image
Alexandra answered ·
2 comments
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

mufassa avatar image mufassa commented ·
Thanks! I think I am coming to the realisation I need to be using VS not ESS for this system given the inverter metering bug which seems to exist, which will solve my issue and just live with an inverter priority setup
0 Likes 0 ·
Alexandra avatar image Alexandra ♦ mufassa commented ·
The other way, if you want the ability to override the programmed connection is this way.
1 Like 1 ·