This is our system,
4, 300ah batteries 2s2p for 24v
Smart shunt
2400watts solar going through 2 150/45 controllers
Quattro 5000 24v
CERBO GX touch 50
Is there a sequence of programming before we make everything "hot"?
Thanks!
Pam
This is our system,
4, 300ah batteries 2s2p for 24v
Smart shunt
2400watts solar going through 2 150/45 controllers
Quattro 5000 24v
CERBO GX touch 50
Is there a sequence of programming before we make everything "hot"?
Thanks!
Pam
Not really. Just do each one.
What you should do to remain safe while you are altering base programming, is power up from the battery with no charge sources connected. As in no AC in and no PV switched on. Then you will be good after programming to let the system run as normal.
41 People are following this question.