MultiPlus 2 issue with ųond on ACout1 output

Hello everyone, unless I’m mistaken, I haven’t found a topic covering my issue:

See my profile: when the grid is present on ACin, there is no problem. The surplus solar power from the inverters on ACout1 is used by the Multi (for the AC loads or to charge the battery).

However, when I disconnect the grid input on ACin (on “red” days), the Multi increases the output frequency to switch off the inverters, even though there are loads on ACout1 and the battery is nowhere near 100% charged. So I lose the solar production from my west-facing PV panels.

Q: Is there a way to keep the inverters active without a grid on ACin?

What AC PV do you have and how have you programmed the inverter to control it?

Hello,
Take a look at my profile: around 2 kWp of panels on 2 AP System micro-inverters, connected to the AC-out-1 output of the Multi 4k5, and 6 kWp via an MPPT 150/100 to an NKON 16 kWh battery on the CAN bus to the Cerbo GX.
In the Multi’s ESS Assistant, you need to specify that there are PV panels connected via micro-inverters to the AC-out-1 output.
There are also settings to configure in the Cerbo.
It’s complicated to explain everything in a message!..
Kind regards

That’s why you should normally rely on your distributor. Distributors must provide after-sales support for the products they sell.