How do I get load to only use battery from 4pm-7pm. Multiplus II, Pylontech charges @ 2am-5am

Multiplus II 48/3000/35, Cerbo GX, Pylontech U2000 by 3 (ESS installed) How do I set up a load to use battery only based on peak cost 4pm-7pm? The battery is scheduled to charge at 2am-5am (low cost). Ideally keeping 15% SOC for protection. Note. NO energy meter is installed.

ESS
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

0 Answers