Since last week, I’ve had a remarkable problem with my installation. The installation consists of:
- 3x MultiPlus-II 6K5 inverters
- 3x JK-BMS with 16s ~360Ah cells.
- 2x MPPT 150/45
- 1x Victron EVCS
- 1x SolarEdge SE6K inverter, AC-coupled
- Cerbo GX
The installation has been running as it should since March. I use DESS for trading, so the setup gets a lot of use. The installation is allowed to charge and discharge at 300A.
The problem is as follows: when the inverters are running at low load, there’s no issue, but as soon as the installation charges or discharges above ~80A, I get the message: VE.Bus Error: VE.Bus Error 10: System time synchronisation problem occurred. I’ve already replaced the Ethernet cables between the units and to the Cerbo with other shielded cables. This made no difference. After that, I updated everything; all the software is now on the latest version. Of course, I’ve also checked whether there’s a DC dip, checked the fuses, and grounded the units using the earth connection rather than only the AC-in connection. None of this made any difference.
Everywhere I look, it says this error mainly occurs in combination with other errors, but that’s not the case for me. Is there a way to monitor the bus data? Or another way to find out which inverter is causing the problem? I’ve had all the units in a single-phase configuration, and then there’s no issue.
What else can I test?