Sorry if someone already explained this, I may not have found the explanation.
I have a Multiplus 2 - 48/5000. With an energy meter from the grid. It allow me to feed back from the AC-IN as expected. But I want to limit what is send back to normal load (because we can hear the MP2 vibration at a certain high load).
I found the limit inverter power (set from ESS from the Cerbo GX) but … I’m wondering of what happended when :
Thanks you. It seems to answer about the AC-IN lost ? The limit is removed ? but… I don’t see what happens when to critical load exceed this inverter limit, is the multiplus using the grid ?