Hello, having brand new EVCS and EV , as well, I connected all this stuff together with my Multis and CC GX.having the possibility to easy position EVCS either on AC In or AC Out (1) I tested both scenarios and and neither is good. 1. When EVCS in on AC In, the power metering done by Multis is ignoring EVCS consumption. 2. When EVCS is positioned on AC-Out-1 , the EV is draining my ESS which is not acceptable. So question to community is: Can the AC-Out-2 be used to connect EVCS only , and programmed to : assure proper power metering of the whole elements of the system AND protect ESS from discharge to EV ? I know AC-Out-2 is grid dependent , but I don’t care about this.
Related topics
Topic | Replies | Views | Activity | |
---|---|---|---|---|
New ESS multiplus II excluding EVCS | 0 | 68 | 4 October 2024 | |
AC Loads and Critical Loads seperate | 2 | 145 | 21 April 2025 | |
EV charger positioning in DESS infrastructure | 0 | 92 | 14 March 2025 | |
Can I run normal loads from battery whilst charging EV from grid | 4 | 112 | 16 April 2025 | |
Use of AC2 from a BYD car in a 3-phase MultiplusII environment | 2 | 31 | 19 June 2025 |