Looking for the Power-up sequence multi RS 6000

I’m looking for the Power Up sequence for the Multi RS 6000.

First connect battery then AC power In, and then connect solar panels?

I can’t find anything in the pdf manual.

Off the top of my head, without having checked:

I would first connect the 48V battery, then switch it on and program the device, and finally switch on the solar panels.

Check all wiring is correct polarity etc.

Power up battery.
Power on inverter - update and program if it is the first time.
Power on ac or solar next.

Test /check functions.

Thanks, both reply same sequence..

1 Like