I currently operate a single (1) phase system, consisting out of
1 MultiPlus 2 48v/32a/3k
1 Gerbo GX
A Pylontech 48v system. (I believe capacity is irrelevant for the question)
Early 2025 I want to upgrade the system to a 3 phase system and to verify my thinking I’d like to understand tif this can be done by simply adding 2 add. MultiPlus II’s, correct?
My homegrid is a 3x25a NL/230v connection and Phase 2 & 3 powers my induction oven. Which brings me to my 2nd question, is it smart to use higher capacity MP’s to ensure proper coverage for induction system? Such as the 5k ones?