Hello,
System: connection 3 x 25A 3-phase MPII 6K5 with Cerbo and 64 kWh Seplos 560L-N (2P16 EVE 3.2V 314Ah) battery and 18.4 WP solar panels.
I have been trying for a while to get grid feed-in working with the ESS. ESS is on, in trade mode and battery optimized without battery life. Battery SOH 100%, SOC 75% (inactive?), target battery 62%. Battery alarms all OK, DVCC OFF, feed-in limitation active?? charge and discharge limit 304A, DVCC was initially on but made no difference, so I turned it off again and restarted the VE-Bus. Which settings do I need to change to make it work? What is wrong? I look forward to hearing from you.
systeem: aansluiting 3 x 25A 3 fase MPII 6K5 met cerbo en 64 kwh seplos 560L-N batterij en 18.4 WP zonnepanelen, ben al een poosje bezig om het terugleveren aan het net met de ess werkend te krijgen, ESS staat aan, in handels mode en accu geoptimaliseerd zonder batterie leven aan, accu SOH 100%, SOC 75% (inactief ?) doel accu 62%, accu alarmen allemaal oke, DVCC OFF, beperking terugleveren actief??, DVCC stond eerst op aan maar ook geen verschil dus weer uitgezet en VE-Bus herstart, welke instellingen dien ik te wijzigen om het werkend te maken, wat is er verkeerd ik hoor het graag