I just want to show my first system. What a journey! But everything works. This system contains:
3 * Multiplus II 48/5000
Cerbo GX
GX Touch 50
Lynx distributor
10-80V to 5V DC-DC converter to power the Lynx distributor
SDM630 and HE11-H Modbus TCP device
Emergency power switch to automatically switch to AC out1 outputs if main grid fails
3 * 16kWh Basen green batteries with active balancers
Power switch to switch off the power to the multplus devices
20A B char 3 phase fuse to protect shorting AC out1 outputs

This is really my first system. Didn’t know I had to use a MK3 to configure the devices. But everything works now with Zonneplan and ESS.
Getting the SDM630 to work properly was a challenge, but it also works. Finished the third battery today. We used 95mm2 wires everywhere. There are 3 batteries. So this is a 48kWh system. The Lynx distributor is connected to the middle battery and the battery on the bottom is connected to the middle one and the battery on top is connected to the middle one.

Best regards,
Mark