Want to pick your brain on a setup. How would you setup two Multi’s charging of two of a three phase grid connection, using a Cerbo to control them? Or does each need a Cerbo for remote control? In VE configure if I add both in parrallel there is no real option for this niche use case
My plan is to charge a battery bank with two Multiplus’'s of the two good phases, as one is always poor. Was wondering what is the most elegant way to set them up on a Cerbo and still achieve this. Rather than have them as independent single phased systems
Yes, but they are so far away that maintanance is a pain. Have dispatched two cerbo’s this morning and will hook them up like that to have some control over them. Thought there is a more elegant way.