Venus OS v3.60~86 available for public testing

Which PGNs are required for digital switching modules to appear?

Hello!

Per just now, v3.60~86 available: stability fixes.

2 Likes

Hi, that is not public at the moment. For now the focus is on making the feature work with industry partners.

Later/soon I’ll consider the details on making the protocol available.

Matthijs

The toggle to temporarily disable Dynamic ESS is still broken in v3.60~86 :disappointed_face:
See: V3.60 - DESS toggle switch disappears

2 Likes

Are you able to make it available to Victron dealers?

Also in the beta, I still experience this issue:

Often in the morning the grid is been used for ac loads which is more expensive than selling less in the evening to support loads until pv power is sufficient.

I have a workaround of lowering the minium soc during the night and rising it during the day, but that is not a real solution.

6 Likes

A small comment regarding the screens, the order is different from one to the other. It would be nice if it was the same.


3 Likes


This happens with EVERY component in Node-RED.

I agree. I mentioned this a few months ago but it’s not been addressed

I put it in the “annoying but not life threatening” pile.

On my brief page Alternator is on the top and the solar is underneath.

If I pull out the sidebar on the brief page they are the opposite way round

On my overview page Solar is on top and Alternator is underneath.

Presumably inverting them on the Brief page would unify the views.



2 Likes