have my dynamic Ess installation running now, but it does not take in account solar production as my SAJ inverter cannot be integrated (I assume). Is there any way to get the installation to include solar production based on some manual attributes? Today it decided to hold on to the battery content since tomorrow evening it will get one cent more, but the solar production of tomorrow daytime will not fit in the battery.
On manual it can be done through node red and setting up your own forecasting.
If you want something through the vrm then add an energy meter to the GX to measure it natively.
There are virtual devices now in the OS so there are ways opening up for other things like this.