Hello,
Always great this discussion forum. Here is the challenge today :
I have 3 groups of strings, each with a MPPT, all in // charging lead acid batteries and Multiplus 5000W. Everything is running fine since 3 years now. For extending the installation, i have in mind to establish some priorities on MPPTs to give some preferences on specific MPPT. All solar panels are exposed the same orientation, but strings are differents.
For now i can just see that MPPT2, then MPPT3 and MPPT3 have this priotity when power is required (charging batteries and inverter conversion). Is there a way to configure the CerboGX in order to have MPPT3 first, then MPPT2, and last MPPT1 when max power is needed.