Has anyone successfully achieved ESS functionally with Quattro 48/10000, 230V using the grid and generator as the inputs?
In my case the grid is on AC IN 2 and the Generator is on AC IN 1, 3 phase system
Cerbo FW 3.52, Quattro FW 2653522
The two main problems are
- The discharge current capacity of the BYD LVL battery is severely restricted with no obvious reason which results in unnecessry grid import.
- The generator does sync but is very unstable - hunting audible thro the Quattros. I have eliminated the generator as an issue.
Any pointers appreciated?