I am happy to see that peak shaving with a single MP in a 3 fase system now seems to work correct in the latest beta’s.
I have a small issue related to this. To conserve energy (from standby losses) I turn my MP off (using node-red) when DESS has no charge/discharge scheduled.
When export limiting is enabled in peak shaving, it will immidiately limit my solar (solaredge) export to 0. As soon as I turn on the MP or disable export limiting, solar is resumed.
I hope this is something that can be fixed.