I plan to install two Multipluss on my 3x400N network and I would like some advice. At the moment, I have no production rejection constraint on the grid (Grid), except for power, because my meter limits to 15A per phase. Even though my two inverters are balanced, sometimes I go beyond this intensity per phase. Rather than consuming unnecessarily and risking total triggering, I would like to store that excess energy on a battery, but only when the intensity exceeds 15A or when the discharge power on the grid exceeds 3500W.
Is it possible to program a Multiplus so that it starts charging only beyond a certain level of rejection in the network, depending on the counter on the phase concerned? In addition, I would also like to program the Multiplus to discharge the batteries at a specific time of the evening, until it reaches a given level of charge.
I have the possibility of placing three EM24 meters: one on production, one on consumption, and one on the feeding column that balances the first two. It is on this last meter that I cannot exceed 15A.
Thank you in advance for your help and advice on this issue.
Very cordially,