Is there an option in the setup of a three-phase (3XMultiPlus-II 48/5000/70-50) configuration to trigger a transfer to the grid when one phase exceeds the maximum kW capacity of the inverter?
I am also facing the following problem: when the batteries are depleted, the system does not switch to the grid, even though it was switching normally a few days ago. What settings are required to fix this?