System Description
I am setting up a system with the following components:
- 2x MultiPlus-II 48/5000, configured in split-phase with 120° phase rotation and floating phase 2.
- 2x MPPT 150/60, each connected to:
- 6x Trina Solar Vertex II 505W panels, arranged in 2S3P per MPPT (total: 12 panels).
- 1x Ekrano GX for system monitoring.
- 1x Pylontech UP5000 battery (100Ah, 4.8kWh, 48V LiFePO4).
Issues Encountered
The Pylontech UP5000 battery is not detected by the Ekrano GX.
- I have fabricated a Type A compatible CAN cable to connect the battery’s CAN port to the VE.CAN port on the Ekrano GX.
- However, the battery does not appear in the list of devices on the GX system.
Possible Causes of Communication Issues with Ekrano GX
Incorrect CAN bus wiring
- I have confirmed the pinout for Type A CAN connection but still no detection.
- Does the CAN bus require a termination resistor on the Ekrano GX?
Firmware Compatibility Issues
- The MultiPlus-II, Ekrano GX, and MPPT firmware versions are all up to date.
- Is there a known issue with Pylontech UP5000 firmware that affects CAN communication with Victron?
Incompatibility between VE.CAN and CAN-BMS
- The Pylontech manual specifies CAN communication for BMS, but should it be connected to VE.Can or VE.Bus BMS for proper integration?
- Would an external Victron CAN-BMS be required for compatibility?
RJ45 Cable Issues
- I have fabricated a CAN cable following the Type A pinout, but there is still no communication.
- Does the Pylontech UP5000 require a shielded CAN cable for proper signal integrity?
DIP Switch Configuration for a Single Pylontech UP5000 Battery
- I am using only one Pylontech UP5000 battery in the system.
- What is the correct DIP switch configuration for a single battery setup?
Is a Battery Reset Necessary?
- Can the Pylontech UP5000 be reset?
- What is the correct procedure to reset the battery if it is unresponsive?
Correct VE.Configure Settings for Proper Communication
- What are the recommended VE.Configure 3 settings for this battery?
- How should the MultiPlus-II and MPPT be configured to ensure stable operation?
What I Have Tried So Far
Checked CAN cabling and confirmed proper wiring:
- RJ45 CAN Pinout (Type A): Verified correct connection.
- Ensured proper polarity for CAN-H and CAN-L.
Confirmed the battery is powered and operational.
Checked settings in Venus OS (Ekrano GX):
- The battery does not appear in the device list.
- Tried manual device search without success.
Verified MultiPlus-II in split-phase 120° mode with floating phase 2.
Checked voltage and frequency of the utility connection.
Issue with grid detection and utility power transfer has been resolved.
Key Questions
What am I missing in the setup that prevents the battery from being detected by the Ekrano GX?
Does the Pylontech UP5000 require a termination resistor for CAN communication with Victron?
What is the correct DIP switch configuration for a single Pylontech UP5000 battery?
Do I need to reset the battery? If so, how?
What exact parameters should I use in VE.Configure 3 to ensure proper communication?
Any insights or recommendations to help solve this issue would be highly appreciated!