How to use MultiPlus 2 as pure inverter, setpoint remotely controlled? (2nd try)

This is the over-all closed loop zero control (setpoint -10 Watts) performance using the Lumentree:

grafik

measured by the gauged(!) grid meter including the jitter of domestic consumption…

how should I ever achieve ‘zero’ feedin with an inverter scattering +30/-50 Watts at a setpoint of 130??? Who the hell ever told that the MultiPlus II is a good inverter??

Friday 13th…