Hello, I would like to ask, in three phase system 3x Multi 48/5000, how to limit feed in power back to grid max 2kw per phase. As I am allowed to back feed only 2kw per phase and not only 6kW total and that can be only on phase 1,2… So please is there a way how to limit back feed to grid to only 2kW per phase? I know it is 6kw in total, that is fine, this is what is allowed, but only 2kw per phase, no more. I found some information on internet telling that yes it is possible, but how to set this properly?
My expectations is, for example: Lets say battery is full, so no need to charge in this moment.
1.phase - multiplus house load is 0,5kw (so there is free load (until 4,4kW common), so 2kW is back feed to grid in this phase), 2,5kW in total.
2.phase - multiplus house load is only 1kw so this phase is free to backfeed to grid 2kW. (3kW in total)
3.phase - multiplus house load is 3kw so remaining available PV power (when available) is used to back feed to grid, lets say 1,4kW under common circumstances to reach 4,4kW load on this phase.
It this possible to set somewhere in Ve.Configure, ESS, or in cerbo gx settings? Even if multiplus is capable to back feed to grid more than 2kW per phase, is there a way to limit this? Not overall limit but limit per phase.
Thank you