Hi looking for some advice on how the export voltage works on the 8kw Quattro. I have my grid on ac2 in, I currently have 3kw of solar and other day it was exporting 2kw to the grid when the batteries were fully charged. I noticed the voltage on the VRM was reading 249. I’m about to install another 6.5 kw of solar, which I assume will push the voltage up higher. I have not yet had a new survey from my dno and would rather do after the event but as ve config is set to g99 (for uk) I just want to know how the Quattro will cope with a rising voltage. Potentially I could export 7kw or more but presume the ac2 in will cut out/relay open before then automatically? Just wanting to know how that will happen whether it will impact ac1 out, whether I need to change any other settings. I will get a eh112 meter at some point
Thanks