Different VE inverters in series for split phase?

I’ve read the documentation on parallel and split phase operation of inverters and scanned the forums, but so far I haven’t seen this directly discussed.

I have on hand a Phoenix 12V 1200W inverter bought for another project. It turned out to be larger than needed, and too big to fit the desired enclosure, so I bought a smaller inverter for that project but kept the 1200 W to repurpose later.

I have a server rack in my homelab that maxes out at about 500 W under load (much less typically), and we have well water here. We’re planning to go full-solar in the next couple years, but in the meantime I’d like to set up an interim system using a new MultiPlus and that spare inverter to provide backup power to the server rack and our well pump (which is 240 VAC split phase).

Conceptually, I’d like to have the MultiPlus charge the 12 V battery bank, to which both it and the spare inverter are connected. Then I’d like to run the spare inverter and the MultiPlus in split phase mode, with the MultiPlus energizing its dry relay output to turn on the other inverter during outages. I know full well that this results in an asymmetric transient during load transfer, and that’s acceptable because:

  • The server rack has dual rails, and the dual-PSU systems can tolerate the “B” rail being down during load transfer.
  • Per local electric code, the water pump won’t be automatically transferred. That will be via a manual load transfer switch, switching both poles at once.
  • Single-PSU load in the server rack includes only small, low-power devices, so I can just put those on the MP’s leg.

There is plenty of discussion in the VE documentation about the need for parallel devices to be identical, but what about series, which is wht split phase really is? And what if one leg of that split phase isn’t critical for transfer speed?

Is what I propose a valid configuration? Thanks for any shared wisdom here.

Series (cascading) is not supported, never has been, you do that at your own risk.
Mixing series and other topologies is even more off-piste.

The tl;dr is, no, that cannot possibly work.

For two inverters or inverter/chargers to produce split-phase, they must communicate with each other so that they can synchronize their waveforms; this is why all published documentation expressly states that exactly identical units are required.

Thanks for the replies. I was somewhat expecting that “no” would be the answer, so … duly noted, bad idea abandoned.

I deleted my suggestion just to be on the safe side.

Thanks for the heads-up

Please do not encourage highly advance configurations unless someone is very experienced, it is not encouraged as a DIY topic and requires specialist guidance.
Microgrid does not support the Phoenix nor other AC power sources, so this is not good advice.