Hi All,
I’ve been reading the manual for the ET340 energy meter and need some help from some who has one or used one.
The manual say it can be used as a single phase Grid meter on L1 and PV meter on L2.
Will it work as a AC meter on L1 and PV meter on L2?
Or can I use it to measure to separate PV systems on L1 and L2?
I guess its physically possible but not sure if the cerbo software will allow me to select these options.
Any help appreciated.