We’re using a 2k Multiplus 48/2000 and 10kWh of LFP battery along with 1200w of Solar capacity to run a traffic cabinet. The solar provides energy offset for the cabinet as well as extendeds the runtime significantly. We have a 400w constant load, and expect around 24hrs of runtime on a full battery - or 2-3 days if we have decent solar yield. So far we’re very happy with the setup.