Have a 3 phase system setup with:
3x MultiPlus II 48V/5000/70.
1x MPPT Charger RS 450 / 200.
Cerbo GX
30kW battery bank Vision/Victron.
VECan Battery Shunt 1000 with Lynx Power and Distributor 1000.
Everything has been running perfect from day 1 (3-4 months operation as of now).
10kW Solar panels.
Have one issue that when charging batteries from the morning from example 70% to 100% via the solar panels, when battery bank reaches 100% and it goes into Absorbtion Charging the MPPT for a while sets PV power to 0W or a lower value than is actually available from the solar (this is randomly on each solar Array).
After a while when Absorbtion is finished = goes into Idle alle Arrays of PV come back to its normal W (for example 3000W / 2000W etc.).
Any reason for this as 30 min. to 1 hour of PV solar power seems to be lost (which could have been thrown back into the net) easily 5-6kwh of energy on a shiny day.
Did a FW update on the system so all is up to date. But same issue.
@= not sure what you mean by this;
So take the management of the MPPT from the Cerbo, set absorption lenght to 12h, they’ll feed the grid all day or as long as the sun shines on you.