For installation scenario:
Charge the storage from the PV installation only to maintain the 40% level if we have reached 40% then do not charge wait until the power fed to the grid exceeds 10 kW then charge the storage to the maximum
I have Solaredge plus Hoymiles plus MPPT 250/100 connected to the system the problem is that the storage is constantly charging from Mppt