My 3-Phase Home-based ESS-Backup System in the South of the Netherlands

Yes, would be better to have none load.

During switching from position 1 to 2 you will pass the “0“ position where power is off.
And switching from “0“ to the 2 position is the same as you would do with a 3 phase circuit beaker (they guarantee switch event to be withing a few ms for all contacts).

Hi Pieter, I’m currently installing a same setup. Could you share your specific details in the config of the Seplos working with the Victron? Cable type, ESS Assistant Settings, Settings in Cerbo etc etc. Many thanks!

Michael

Hi Michael, Im currently on Holliday so not able to give you this info right now. I will be back next week. If you send me a PB with your email address I will share with you what I have. Just give me some time for it.

Best regards,

Pieter

Hi Pieter,

I can’t seem to DM you on this forum. But if you can send me the info after your holiday at ‘michael (at) ivadvies4u (dot) nl’ it’ll find it’s way to me. Info can be in Dutch. I’ll also post the question on FB so hopefully I’ll have lots of info then. Enjoy your vacation!

Michael

Hi everyone, please open design or help requests in the DIY section and don’t dilute the topics in this section which are for members to show us their amazing projects.
I have moved Ron’s requests to its own dedicated topic linked to above.
Thanks.

Yes. you are correct. Will update you with pictures, once finished. (I have in the planning - 3 to 4 month from now). As “saldering”goes away in 2027 !

Happy Easter. :hatching_chick:

Thanks. We look forward to see you opening your own “show us” topic with your new system.