Hi, Can the new Lynx NG BMS be installed in reversed orientation i.e. Loads & Chargers to the Left and Batteries to the Right (note with cables still connected from the bottom i’m not talking about flipped the whole assembly upside down and using those optional inverted stickers with cable entries at the top).
I heard there is a way with the NG version BMS with updated firmware but cannot find anything in the manual? I know there is such an option for the Smart BMS in the App to swap current flow, and that the old Lynx Shunt was just a matter of swapping shunt sense wires around, but what about the new Lynx NG BMS? If possible would really help in my new installation!