Dear Forum First best wishes to all of you. My point for now: I have a small ESS system set up around a Multiplus compact 24V 1200/25. Once used in its original setting, (just inverter) it loaded the battery up with capacity.up to 600 Watt as per spec. I apply it now in ESS mode, external control configured in NodeRed. When charging the battery its loading-capacity is limited to 320 watt eventhough a setpoint higher is commanded via the “AC Power L1 Setpoint” label. The grid current limiter is set to 16 Amps so that should not be the issue. Anybody any idea? Thanks in advance.
Related topics
| Topic | Replies | Views | Activity | |
|---|---|---|---|---|
| ESS: Muiltiplus only charging on excess power, but not from grid (e.g. keep battery charged) | 1 | 106 | 6 January 2025 | |
| Grid current limit exceeded - 3-phase ESS, Multiplus II 48/5000/70 | 7 | 132 | 26 September 2025 | |
| Multiplus Charging capacity | 6 | 147 | 6 April 2025 | |
| Maximum charge currents for Multiplus II and MPPT - can one apply rules? | 5 | 919 | 25 October 2024 | |
| ESS battery charge rate from grid | 6 | 481 | 10 November 2024 |