Hello,
Now that I have a digital meter, I would like to install batteries.
I am not allowed to change anything in my existing configuration, otherwise I will lose my certificates (Belgium). So, instead of sending the electricity converted by my panels to the grid, I first need to make sure my batteries are charged, and only send it to the grid once they are full. I need to have the option of going completely off-grid.
My panels provide a peak output of 8,500 watts in total. My current situation:
2 SMA (Sunny Mini Central SMC 4600A) inverters that feed the electricity into the grid on a single phase over two phases; I must not alter these.
What do I want?
I want to send the electricity generated by my panels / SMA units to my batteries first, and only send it to the grid once they are charged. The batteries must be able to supply three-phase power.
I want to work with
Victron MultiPlus-II 48V 6.5kVA 100A (3 units), because I also have a heat pump, but I would like to supply the rest of my house with electricity as long as there is enough charge in my batteries.
I have already done my research, and this is what I will need from Victron:
Victron Energy Cerbo GX MK2 ControllerVictron
Energy Lynx DC Distributor (M10) (2 units)
Victron Energy VM-3P75CT Energy Meter
Victron MultiPlus II 48V - 6K5VA - 100A (3 units)
Which battery? I would like to go for 25 kWh.
And I will also order the necessary cables and fuses.
The only thing I am missing is a wiring diagram showing me how to install everything.
Could anyone help me further?
Many thanks in advance.