Hi here a preview of my system in Egmond the Netherlands

Hi here my system 3F Multis (48/5000/70) 45Kwh batteries , 17Kwp solar , 8Kwp DC and 9Kwp AC. And D-ESS in progress with some NodeRed flows. With API cache the actual price from the VRM then with some other info from the cerbo trough ModBus to my Siemens Logo that is in control of my geothermic system ( Brine Heatpomp, swimming pool and hot water installation) to use the extra solar power in the summer (heat the pool , make hotwater and as last heat up my brine installation)

15 Likes

Neat setup there @hans818
Very nice!

1 Like

Nice indeed! and looking very sleek.

1 Like

Amazing setup @hans818, thanks for posting it.

1 Like

Best I’ve seen.

1 Like

Very smart, excellent installation, do you find the room gets warm when the system is working hard?

1 Like

Yes but I can only post one picture… the room is pretty big 11x3 meters but still the temperature is rising in the next winter I make my brine source to go through my battery’s and make some ventilation solution

I would be interested to see how you get on, please keep us posted on here.

1 Like

Very nice! I’d be surprised this is 100% DIY. There is a lot of experienced hands there. Very neat indeed!

1 Like

Very smart system, lovely installation. :+1: