Hello
My installation consists of the following parts.
3*MP 2 inverters in 3-phase configuration
Cerbo GX
Sma Inverter 5000LT21 L1
Huawei Sun2000 4.6KLT L1
4 Battery boxes of 16KW/h
All my consumers are connected to the AC AUT1
While setting up my ESS assistant for L1 I foresee the SMA inverter where I can enter the power and frequency for the phase shift. This SMA is a single phase inverter.
Now when I go to the next phase L2 where the sun2000 inverter is on I only get the question if there is a solar installation on this AC AUT. I answer yes but now I get no questions what power this inverter has or I cannot enter the frequencies for the phase shift.
Now when I go to look in the Cerbo it is like it is installed as a 3 phase inverter.
What can I do to set this Sun2000 correctly so that the installation can run robustly?
Thanks in advance for your support
Greetings
Erik