There is a technical limitation in play that the DESS execution control process, not sure whether located on the Cerbo GX (VenusOS) or on the VE-Bus device (ESS assistant) has a maximum resolution (precision) of one full (1.0%) percent SoC. See second part of this post:
UpCycleElectric
(Jan)
32