I’ve been building Victron systems for many years in automotive and marine applications. This is my first fixed installation, and it is for my home. I’m an engineer by trade, and I work as dealer support for a manufacturer of CT scanners.
Here is the system plan:
Here is the system plan:
-
MultiPlus-II 15000/48
-
2x Seplos Mason 560 32kWh: These are ready-to-go batteries with a great active BMS, 157A rated continuous charge/discharge, 200A max, and a built-in fire suppression system. Total of 64kWh. [Link here]
-
MPPT 250/60 DC-side solar charger
-
Lynx 1000 M10 Power In and Lynx Distributor
-
SolarEdge AC grid-tie inverter: This was an existing system that I had to keep, since it’s getting a government feed-in payment grandfathered at a very high rate—60p per kWh, I believe.
-
Cerbo GX: This will also control the room ventilation via the relays.
The system is a work in progress. I will show you the build photos!
First, the battery room:
I wanted to create an environment that will keep the batteries and the Victron equipment at peak performance and longevity. Keeping lithium batteries around 21 degrees is good for them, and they definitely shouldn’t drop below zero.
I didn’t have space in the house; I hate attic installations and hard-to-reach, awkward setups. I dislike how such important infrastructure is often installed as an afterthought. Also, having a large battery system inside the house can void your insurance, as there is a possibility of fire.
With that in mind, I wanted to build an insulated, fire-resistant room inside my outbuilding garage.
I used metal stud walls for fire resistance, followed by pinkboard fire-resistant drywall. This will also help maintain humidity levels in the room and reduce condensation.
The room is insulated with 70mm Rockwool and will be completely airtight. I will duct in controlled, filtered ventilation to prevent dust build-up. The room should self-heat due to the waste heat produced by the system (though will have a backup space heater). The ventilation will run only to reduce the room temperature.
A galvanized steel back wall is installed on top of the drywall, as drywall can’t take a screw easily. I wanted to be able to install the hardware easily anywhere with self-tapping screws. It also makes for a clean look and provides additional fire protection.
The concrete floor is sealed with a 2K industrial epoxy.
More in the next post!