Synchronize 2 charging controllers SmartSolar 250/100 and BlueSolar 150/45

My setup is as follows:

  • Cerbo GX firmware v3.55
  • BMV-700 firmware V3.11
  • BlueSolar charger MPPT 150/45 rev. 5 firmware 1.64
  • SmartSolar MPPT VE.can 250/100 rev. 2 firmware 3.16
  • 1 battery bank
    I would like to synchronize the operating mode using SmartSolar one as master and the BlueStar as slave (mode Off, Bulk, Absorption, Float).
    The SmartSolar switches to floating mode more quickly at the end of charging (up to 2 hours before) or sometimes it goes into absorbing mode while the main one (SmartSolar) is still in bulk mode.
    Is there a solution?

Thanks for the reply. Just for my understanding, why do we have to put 6 hours rather than 4 or something else?
Is there another solution to synchronize the 2 charge regulators?

This solution does not work in my case. The BlueSolar does not behave at all in the same way as the SmartSolar.

On both devices, it took me 4 hours.