Just got my system up and running since a couple of days.
I have a 3 phase Multi RS system with SMA Inverters.
In the testing phase there was no load connected to the Multi RS and Solar and House was still grid connected. Yesterday I made the switch over (1 0 2 switch) to put my system in the middle so my Solar and House are connected to AC Out 1.
I have them positioned at AC Output in the config.
As you can see PV and Critical Load to too close to be a coincidence.
5kW from PV, 5kW into critical load, battery charging with 2kW, 2kW going to grid.
What am I doing wrong? When I change the position in the configuration it simply doesn’t measure.