I am currently running a 10kv Quattro with is being driven to overload as I am adding extra loads, I have a very small Grid connection (3Kva) this has only been used very rarely for Battery charging. I want to fit an additional Multiplus 2 in series onto the Quattro input, and also use the multiplus 2 anti islanding facility to use the grid connection as well. is their any potential problems with this setup
Related topics
| Topic | Replies | Views | Activity | |
|---|---|---|---|---|
| Adding a MultiPlus-II 15KVA to an existing two Quattro 10KVA ESS System | 12 | 143 | 12 January 2026 | |
| Quatro 10kVA to replace Multiplus II 5kVA | 1 | 53 | 23 December 2025 | |
| Dual MultiPlus Installation (10.000 VA and 2.000 VA) – Using Grid and Generator EN/FR | 0 | 51 | 15 May 2025 | |
| Finding correct Multiplus/Quattro for my needs | 3 | 97 | 29 May 2025 | |
| Can I make three of the new 20kW Multiplus units grid compliant in the UK? | 14 | 230 | 5 January 2026 |