Hello, I would like to use node red flow for AC IN current limit change based on AC OUT highes phase load level.
I use 3ph system with 3*Multiplus 2 3000VA, offgrid with AC Ignore assistant and cerbo relay 1 as generator start/stop. Conditions AC Load nad SOC.
Is possible automatical change of AC IN current limit via NODE RED?
Are there necessary some changes in VE BUS system setup via Ve Config? For example remote manual change of current limit disabled?