I have 3Phase MP II, Battery, EVCS, solar charger on dc.
The EVCS throttles down the Charge A to fast or the Solar Chargers ramp up Power delivered to slow.
I need the Modbus parameter i need to increase the waittime for throttling down the Charger Power.
I have looked at the Parameter excel, but the descriptions are not very descriptive.
Could someone point out the right ones?