ESS takes a long time to "calibrate" itself

I have a MP2 3000 which I run as an ESS, I manually send it commands to realize a 0 export setup.

Throughout the day, due to other (micro)inverters exiting, I have times where I dont need any production from the MP2 as I’m already net 0 / exporting, so I just ceise sending the MP2 commands so it in term turns off its Inverter.

Now all of this works perfectly fine, however once the day comes to an end and I need the MP2 to produce a (low) amount of watts, it takes upwards of 5 minutes before its able to do so.

In this example, I told the MP2 to produce a fixed amount of 50 Watts - As you can see, rather than doing 50 Watts it started off at 1.1kW (300W base production from other inverter) and slowly ramped down over the course of 5-10 minutes, never actually reaching 50 Watts but halting at ~200 (If I wait long enough, eventually it will be able to do 50W)


If I chose to manually restart the MP2 this issue is resolved instantly.

The MP2 / ESS Assistant are updated to the very latest version, would there be some way to resolve this / improve the ESS to fix this?

Could it be the same issue as stated here: https://community.victronenergy.com/t/bad-control-characteristic-in-ess-mode-and-major-grid-feed-in-despite-grid-feed-in-is-off/4494?

I have a newer MP2 model which doesnt have a 3.5mm Jack for the current sense.

Furthermore as mentioned before, restarting the MP2 instantly resolves the issue.