Last systems in service in South of France

AC-COUPLING via AC-OUT1 :

  • SolarEdge 10 kVA / 10 kWp, with frequency-shift control enabled, tested, and fully operational
  • M+ 10 kVA
  • 48 kWh battery system in a single enclosure, installed inside the white fireproof cabinet
  • DF 315 A load disconnector

DC COUPLING

  • RS Solar 450/200, with 3,220 Wp connected to each MPPT
  • M+ 10 kVA
  • 4 × Pylontech US5000 batteries. The customer had already ordered the batteries before contacting me and subsequently requested the installation and commissioning of the complete system.
  • Many load disconnector :smiley:

I always use a source changeover switch in my installations. This allows the Victron system to be isolated while keeping the customer’s power supply available during maintenance. In the event of a fault, the customer can switch back to the grid, giving me time to come on site and carry out the necessary troubleshooting or repairs.

DC COUPLING

  • RS Solar 450/100, with 3 kWp connected to each MPPT
  • New M+ 6.5 kW
  • 2 × Pylontech US5000 batteries. The customer had already purchased the batteries before contacting me for assistance with the system installation and commissioning. He have to add bracket to the battery for cooling.

Best Regards,
Patrick.

6 Likes