Hi,
Has anyone experienced the battery not charging from grid during low prices? It’s not even planned in the scheduler, I would have expected the negative price would have a high coefficient in the algorithm,
The installation it’s a fairly simple:
1 x 15KVA Multiplus II
1 x MPPT 250-100
3 x JK BMS batteries (320Ah)
1 x EM112 meter at the grid connection point
All loads are connected to the critical loads AC out1
On this occasion 04/08/25 11:00 no charging was planned so I ended up with scheduling the old fashion way from the ESS menu (and disabling DESS to activate)
On other occasions like 30/07/25 DESS would act pretty much like an ESS system letting the battery drain without any consideration of the prices,
There’s no payment received for any export at this location but surely if the prices are negative then it would be cheaper free,
The load and solar forecast seem to be accurate enough for this installation,
Any thoughts on what to check and apply for better performance?
Regards George