BETA: Turn surplus solar into useful work with GX Opportunity Loads

I have already been running the latest beta version 3.80-42 on several plants, and I have switched one plant with Wallbox to MQTT and opportunity loads. Today it has been running for the first full day, and I am really impressed by how well it works. I really like how you solved this with the short absorption followed by a brief discharge to bypass the float phase, preventing the other solar systems from shutting down.

I can imagine, however, that there are plants that want to keep the old control logic. Will there be an alternative selection in the future? The installations that have the new version are running, as far as I can see, very stably. I will switch more plants to the new beta in the next few days that also have a Wallbox.

Thank you for your work.